Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work, Unpublished PhD Thesis, , University of Michigan.

Al-Hussayen, M A (1980) Building problems in Saudi Arabia: The need for building research, and the development of building research approaches, Unpublished PhD Thesis, , University of Michigan.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics, Unpublished PhD Thesis, , University of Michigan.

Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality, Unpublished PhD Thesis, , University of Michigan.

Chen, T Y-J (2019) Advancing quantitative risk analysis for critical water infrastructure, Unpublished PhD Thesis, , University of Michigan.

Choi, B (2018) The role of socio-cognitive process in construction workers' safety behaviors, Unpublished PhD Thesis, , University of Michigan.

Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure, Unpublished PhD Thesis, , University of Michigan.

Colberg, M R (1950) Federal control of construction following World War II, Unpublished PhD Thesis, , University of Michigan.

Dias, A, Jr. (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects, Unpublished PhD Thesis, , University of Michigan.

Dzeng, R-J (1995) CasePlan: a case-based planner and scheduler for construction using product modeling, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.

Han, S-H (2004) A working prototype of distributed collaborative architectural design system, Unpublished PhD Thesis, , University of Michigan.

Hasell, M J (1983) Gaming simulation: A communication tool for architects and designers, Unpublished PhD Thesis, , University of Michigan.

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction, Unpublished PhD Thesis, , University of Michigan.

Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems, Unpublished PhD Thesis, , University of Michigan.

  • Type: Thesis
  • Keywords: fabrication; information management; life cycle; manufacturing; monitoring; case study; robotic; architect; designer; experiment; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304433448
  • Abstract:
    The research described in this dissertation brings together various technologies in manufacturing and information management and suggests a new paradigm for the design, manufacture, and lifetime use of artifacts using kit-of-parts systems and rule-based assembly. The questions are asked: If architects, designers, and users were given direct online connection to real-time design information sources and fabrication processes, and have the ability to monitor and control the current state of designed objects throughout the objects' lifetime, how would the entire life-cycle of a product be affected, and how would design processes change? During the course of the research described in this dissertation, a series of simulations and experiments were conducted which produced a computer-based simulated design, manufacture, and use environment wherein these questions could begin to be answered. A kit-of-parts model building system was devised which could be used to design model buildings in virtual form by downloading virtual representations of the components from the Internet and assembling them into a desired form. The virtual model building could then be used to order the manufacture of real components online, and remotely controlled robots used to assemble the actual building on the site. Through the use of special hardware manufactured into the components, real-time remote monitoring and control of the current state of the finished model building was affected during the building's lifetime. The research establishes the feasibility of an online life-cycle environment where a virtual representation of an artifact is created and used to both manufacture a real-world counterpart and also monitor and control the current state of the real-world object. The state-of-the-art of pertinent technologies were explored through literature searches and experiments. Data representation, rule-based design techniques, robotics, and digital control were studied, and a series of design principles established which lend themselves toward a life-cycle management paradigm. Several case studies are cited which show how the design principles and life-cycle management environment can be applied to real buildings and other artifacts such as vehicles and marine structures. Ideas for expanded research on the life-cycle management paradigm are cited.

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry, Unpublished PhD Thesis, , University of Michigan.

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress, Unpublished PhD Thesis, , University of Michigan.

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya, Unpublished PhD Thesis, , University of Michigan.

Kalampakorn, S (2000) Stages of construction workers' use of hearing protection, Unpublished PhD Thesis, , University of Michigan.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities, Unpublished PhD Thesis, , University of Michigan.

Kirk, S J (1992) Improved design decision-making using small group value engineering gaming/simulation, Unpublished PhD Thesis, , University of Michigan.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures, Unpublished PhD Thesis, , University of Michigan.

Leu, S-S (1992) Object-oriented representation model of construction technology information, Unpublished PhD Thesis, , University of Michigan.

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams, Unpublished PhD Thesis, , University of Michigan.

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment, Unpublished PhD Thesis, , University of Michigan.

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work, Unpublished PhD Thesis, , University of Michigan.

Martin, S D (1981) Building contracts in classical Roman law, Unpublished PhD Thesis, , University of Michigan.

Mason, B (2023) Advancing autonomous green stormwater infrastructure, Unpublished PhD Thesis, , University of Michigan.

McIntosh, J F (1984) The application of the relational data model to computer-aided building design, Unpublished PhD Thesis, , University of Michigan.

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system, Unpublished PhD Thesis, , University of Michigan.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies, Unpublished PhD Thesis, , University of Michigan.

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan, Unpublished PhD Thesis, , University of Michigan.

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach, Unpublished PhD Thesis, , University of Michigan.

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations, Unpublished PhD Thesis, , University of Michigan.

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics, Unpublished PhD Thesis, , University of Michigan.

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway, Unpublished PhD Thesis, , University of Michigan.

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost, Unpublished PhD Thesis, , University of Michigan.

Tharachai, T (2004) Multiple project resource scheduling for construction, Unpublished PhD Thesis, , University of Michigan.

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation, Unpublished PhD Thesis, , University of Michigan.

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction, Unpublished PhD Thesis, , University of Michigan.

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.